Category: Architectural Design

Architects, engineers, plans, and the design process behind Tampa Bay custom homes and renovations.

  • Hiring an Architect for a Home Addition: What Your Plans Must Show

    Hiring an Architect for a Home Addition: What Your Plans Must Show

    Hiring an Architect for a Home Addition: What Your Plans Must Show

    Additions look simple on a napkin. Draw a box. Attach it to the house. Done.

    Then you open the wall and find out the house isn’t quite what anyone thought it was. The trouble with additions almost never lives in the new box. It lives where the new box meets the old one.

    Good addition plans start with what’s already there, then show exactly how the new connects to the old. Here’s what your plans need to show, in the order they usually come together.

    Key Takeaways

    • Most addition designs start with as-built drawings of the existing home.
    • The tie-in, where the new roof, walls, floor and systems meet the old, needs its own clear details.
    • Structural engineering and the FEMA 50% rule can shape the whole project, especially in flood zones.
    • Setbacks often decide where an addition can go before design even starts.

    Step One: As-Builts of What You Have

    As-built drawings, also called existing-conditions drawings, document what is actually on your lot today. That means measured floor plans, exterior elevations and notes on existing MEP and structural conditions where they’re visible.

    If you have the original plans, great. Many homeowners don’t, and even when they do, the house has often changed since. A closed-in porch. A moved wall. A water heater that ended up somewhere it wasn’t drawn.

    An addition has to be designed around reality, so as-builts are often required before an addition or remodel can be designed. At TomCo, small as-built and permit-drawing projects fall at the studio’s starting price of around $3,500. Learn more about our as-built drawings in Tampa.

    The Tie-In: Where Additions Go Right or Wrong

    Every addition has a seam. Your plans should show how each piece crosses it:

    • Roof. How the new roof meets the old one, including slopes, flashing and drainage.
    • Floor. Whether the new floor matches the existing floor height, or how the plans handle the step.
    • Foundation. How the new foundation sits next to the old one.
    • Walls. Where existing exterior walls get opened up and what carries the load across the opening.
    • Systems. Whether the existing HVAC, electrical panel and plumbing can handle the new space, or what changes.

    Those connections are where leaks, cracks and uneven floors typically start when they aren’t drawn clearly. A crew can’t build a detail nobody drew.

    Structural: What the Engineer Covers

    Structure is its own discipline. For an addition, engineering typically covers the new foundation, framing, connections, wind-load design and any beams needed where existing walls come out.

    Tampa Bay design wind speeds are high and site-specific, so the new structure has to carry wind loads properly and tie into the existing house. Building departments typically require signed and sealed structural documents. Requirements vary by jurisdiction.

    Going up instead of out adds another question: whether the existing structure and foundation can carry a second story. That’s a big factor in our comparison of a second-story addition vs. a bump-out.

    The FEMA 50% Rule

    If your home is in a flood zone, read this part twice.

    In general terms, the FEMA substantial improvement rule says that if the cost of improvements reaches half of the building’s market value, the existing house may need to be brought up to current flood requirements. That can include elevating it. How costs and values are counted varies by jurisdiction.

    That can turn an addition into a much larger project, so check it before design goes far. Our post on the FEMA 50% rule explains how it works.

    Setbacks, Zoning and Lot Limits

    Before anyone designs the addition, someone needs to know where it can legally go. Setbacks, height limits, lot coverage rules and easements can all shrink the buildable area on your lot. These rules vary by jurisdiction.

    A current survey is usually the starting point. Survey is an outside discipline that TomCo coordinates rather than includes automatically.

    The Sheets Your Addition Plans Should Include

    SheetWhat it showsWhy it matters
    Survey and site planLot lines, setbacks, existing and new footprintShows the addition fits the zoning rules
    Existing conditions (as-builts)Measured plans and elevations of the current homeThe baseline for every design decision
    Demolition planWalls, roof areas and finishes being removedTells reviewers and crews what comes out
    Proposed floor plansNew and existing spaces with dimensionsLayout, flow and tie-in locations
    Exterior elevationsNew and existing facades togetherRoof lines, windows and how the addition matches
    Sections and tie-in detailsRoof, wall, floor and foundation connectionsWhere leaks and cracks start if done wrong
    Structural sheets (by engineer)Foundation, framing, connections, wind designTypically required signed and sealed
    MEP plans or notesElectrical, plumbing and HVAC changesCapacity and code compliance
    Energy calculationsEnvelope and equipment complianceFlorida Building Code energy compliance
    Flood documentation (if applicable)Elevation information and substantial improvement reviewFEMA 50% rule compliance

    Do You Need an Architect for an Addition?

    Not legally, for a single-family home. Fla. Stat. 481.229 exempts one- and two-family residences from the architect license requirement, so a drafter or designer can prepare the plans. Structural engineering is still typically required.

    An architect earns the fee when the tie-in is tricky, the lot is tight, the flood rules come into play or you want the addition to look like it was always there.

    TomCo design projects start around $3,500, and larger or more complex work typically runs about $8,000–$40,000+. The fixed fee is quoted up front after a discovery call. For the construction side of the budget, see how much a home addition costs in Tampa.

    Frequently Asked Questions

    Do I need an architect for a home addition in Florida?

    Not legally for a single-family home, since Fla. Stat. 481.229 exempts one- and two-family residences. Structural engineering is still typically required, and an architect helps most when the tie-in, lot or flood rules are complex.

    Why do I need as-built drawings first?

    As-builts document what is actually there, including measured floor plans, elevations and visible MEP and structural conditions. The addition has to be designed around those real conditions, so they are often required first.

    What is a tie-in detail?

    A tie-in detail shows exactly how the new roof, walls, floor and foundation connect to the existing house. These connections are where leaks, cracks and uneven floors typically start if they are not drawn clearly.

    How does the FEMA 50% rule affect my addition?

    In a flood zone, if improvement costs reach half of the building’s market value, the existing home may need to meet current flood requirements, which can include elevation. Rules vary by jurisdiction.

    What does it cost to design an addition with TomCo?

    TomCo design projects start around $3,500, including small as-built and permit-drawing projects. Larger or more complex work typically runs about $8,000 to $40,000 or more, with a fixed fee quoted after a discovery call.

    Can TomCo draw my addition if another contractor builds it?

    Yes. You can design and build with TomCo, or hire the Design Studio for design only. We also work for other general contractors who need permit drawings and as-builts.

    Build On What’s Really There

    The best additions feel like they were part of the original house. That starts with accurate as-builts and ends with tie-in details a crew can follow. TomCo’s Design Studio and build team handle both, so you get plans drawn by people who know how additions come together in the field. See our home additions in Tampa.

    Schedule a private 30-minute consultation or call (813) 922-2299.

  • Stock House Plans vs. Custom Plans in Florida: What It Really Takes to Permit

    Stock House Plans vs. Custom Plans in Florida: What It Really Takes to Permit

    Stock House Plans vs. Custom Plans in Florida: What It Really Takes to Permit

    It’s late. You’re scrolling a house-plan website and there it is: four bedrooms, a big kitchen island, a deep front porch. You buy the plan set before you can talk yourself out of it.

    A few weeks later, someone asks you about wind loads, flood elevation and energy compliance. The plan doesn’t say. It wasn’t drawn for your lot. It wasn’t drawn for any lot.

    In Florida, a stock house plan is a starting point, not a permit set. Here’s why internet plans need work before they can be permitted in Tampa Bay, what modifying one involves and how it stacks up against a custom plan.

    Key Takeaways

    • Stock plans are typically drawn without a specific site in mind, so in Florida they usually need site adaptation for wind, flood, energy and setbacks.
    • Modifying a plan is more than redlining a few walls. The set has to be checked, revised and coordinated with engineering.
    • The Florida Building Code 9th Edition takes effect December 31, 2026, which can change what an older plan needs.
    • TomCo’s Design Studio work starts around $3,500, with a fixed fee quoted after a discovery call.

    Why Internet Plans Don’t Permit As-Is in Florida

    Stock plans sell because they’re designed to work almost anywhere. That’s exactly the problem in Florida. Your building department doesn’t care how a plan works almost anywhere. It cares how the house performs on your lot.

    Wind

    Tampa Bay design wind speeds are high and site-specific. Building departments typically require wind-load design and signed and sealed structural documents for new homes. A plan drawn for a national audience rarely comes with that work done for your exact site, so an engineer has to design the structure to match.

    Flood

    If your lot is in a flood zone, the lowest floor must be elevated to the design flood elevation set by FEMA maps and local freeboard rules. In coastal V and Coastal A zones, the home needs an open foundation such as piles or columns. A plan drawn for a slab on flat, dry ground may need a completely different foundation and a rethink of how you get to the front door. Our guide to building on a waterfront or flood zone lot in Tampa covers the basics.

    Energy

    Florida’s code has its own energy and envelope requirements, and energy calculations are a separate discipline from the drawings. The 9th Edition tightens envelope and energy requirements further, so a plan built around older assumptions may need window, insulation or equipment changes.

    Setbacks and zoning

    Every lot comes with setbacks, height limits and other local rules. A plan designed for a wide suburban lot may not fit a narrow infill lot, and a two-car front garage may not work where the jurisdiction or the street layout pushes you somewhere else. These rules vary by jurisdiction, so they have to be checked lot by lot.

    What Modifying a Stock Plan Involves

    People picture a quick markup. In practice, adapting a stock plan for a Florida permit usually means:

    • Getting usable files. Check what the plan seller provides and what its license allows you to change.
    • Fitting the site. A survey and a site plan that place the house within setbacks and address drainage and flood elevation.
    • Reworking the foundation. Especially on flood zone or coastal lots.
    • Structural engineering. Wind-load design and signed and sealed structural documents, typically required.
    • Energy compliance. Calculations for the envelope and equipment.
    • Your own changes. Almost everyone wants a bigger pantry, a different garage or one less formal room.
    • Code notes and coordination. Making the whole set agree before it goes to review.

    Add it up and some modification jobs turn into most of a redesign. That isn’t a reason to avoid stock plans. It’s a reason to know the full scope before you buy.

    Who can do this work? Under Fla. Stat. 481.229, a drafter, designer or architect can legally prepare plans for a single-family home. We compare the options in draftsman vs. architect in Florida.

    Stock vs. Custom: Cost and Time Compared

    FactorStock plan, modified for FloridaCustom plan
    Up-front plan costPurchase price plus modification feesDesign fee; at TomCo, from about $3,500, with larger or complex work typically $8,000–$40,000+
    Site adaptationRequired: wind, flood, energy and setbacks added after the factBuilt in from the first sketch
    Structural engineeringSeparate and typically requiredSeparate and typically required
    Fit to your lotAdjusted to fitDesigned around it
    Fit to how you liveClose, with compromisesProgrammed around you
    Time to permit-readyVaries with how much has to changeAt TomCo, architectural design starts at about 6 weeks from discovery to permit-ready documents; full custom homes typically 12–24 weeks or longer
    Surprises at plan reviewMore likely if the base plan assumed different conditionsFewer, since site and code are addressed from day one

    The Middle Ground

    You don’t have to pick between a catalog plan and a blank sheet. Many owners start from a plan they love and have it adapted, or start custom but borrow ideas from plans they’ve saved. That’s a version of the semi-custom path we cover in semi-custom vs. fully custom homes in Tampa.

    Bring the plan to your first design meeting. It’s a great way to show what you like, even if very little of it survives.

    Questions to Ask Before You Buy a Plan

    • What flood zone is my lot in, and what does that mean for the foundation?
    • Will the footprint fit inside my setbacks?
    • Does the seller allow modifications, and in what file format?
    • Who will handle the structural engineering and energy calculations?
    • Will my permit application land before or after December 31, 2026?

    Frequently Asked Questions

    Can I use a stock house plan in Florida?

    Often, yes, but it typically needs site adaptation first. Florida plans must address wind loads, flood elevation, energy requirements and local setbacks for your specific lot.

    Why do stock plans need changes for Tampa Bay?

    Tampa Bay design wind speeds are high and site-specific, and flood zone lots must be elevated to the design flood elevation set by FEMA maps and local freeboard rules. Most internet plans are not drawn for those conditions.

    Who can modify a stock plan for a single-family home?

    Under Fla. Stat. 481.229, a drafter, designer or architect can legally prepare plans for a single-family home. Structural engineering is still typically required.

    Is a custom plan always more expensive than a stock plan?

    Not always once modifications are counted. At TomCo, design projects start around $3,500, and the fixed design fee is quoted up front after a discovery call.

    How long does a custom plan take?

    At TomCo, architectural design starts at about 6 weeks from discovery to permit-ready architectural documents. Full custom homes typically take about 12 to 24 weeks or longer.

    Does the 2026 code change matter for stock plans?

    It can. The Florida Building Code 9th Edition takes effect December 31, 2026, with updated wind-load provisions and tighter energy requirements, so an older stock plan may need more updating.

    Start From Your Lot, Not a Catalog

    A stock plan can save you time if it’s close to what you need and your lot cooperates. If it isn’t, a custom plan often ends up cleaner, faster through review and better suited to how you live. TomCo’s Design Studio can adapt the plan you already have or design one from scratch, then build it or hand it to your contractor. See our custom home plans and blueprints.

    Schedule a private 30-minute consultation or call (813) 922-2299.

  • Draftsman vs. Architect in Florida: Who Can Legally Draw Your Plans?

    Draftsman vs. Architect in Florida: Who Can Legally Draw Your Plans?

    Draftsman vs. Architect in Florida: Who Can Legally Draw Your Plans?

    You’ve got two quotes for house plans on your desk. One is from a drafter. One is from a licensed architect. They’re not the same number, and a friend just told you that only an architect can legally draw a house in Florida.

    Your friend is wrong, at least for most homes.

    In Florida, a drafter can legally draw your single-family home, but who should draw it depends on what you’re building and how much help you want getting it built. Here’s what the law says, where it stops and how to pick fairly between the two.

    Key Takeaways

    • Fla. Stat. 481.229 exempts one- and two-family homes, townhouses and their domestic outbuildings from the architect license requirement, regardless of cost.
    • Other types of buildings costing less than $25,000 are also exempt, except schools, auditoriums and other public-use buildings.
    • Commercial projects such as franchise restaurants, retail and offices generally need a Florida-licensed architect.
    • Either way, structural design still needs engineering.

    What Florida Law Says

    The key statute is Fla. Stat. 481.229(1). It says no architect license is required to prepare plans for “any one-family or two-family residence building, townhouse, or domestic outbuilding appurtenant to” one. That exemption applies regardless of cost.

    So a modest starter home and a large waterfront custom home are treated the same way. The size of the check doesn’t trigger the architect requirement. The type of building does.

    The same subsection covers any other type of building that costs less than $25,000, with a carve-out: schools, auditoriums and other public-use buildings don’t get the exemption.

    The plain-English version: a drafter or designer can legally draw a single-family home in Florida.

    Where the Exemption Stops

    Once you leave single-family, duplex and townhouse territory, and the building costs $25,000 or more, the picture changes. Commercial buildings, including franchise restaurants, retail stores and offices, generally require a Florida-licensed architect, with engineers handling structural, MEP and the other disciplines.

    There’s one more wrinkle. Under Fla. Stat. 481.229(4), registered civil and structural engineers may perform architectural services that are “purely incidental” to their engineering practice. They can’t call themselves architects, though. If you want the full breakdown of who does what, read our post on architect vs. engineer for a Tampa home project.

    Engineering Is Still on the Table

    Here’s the part people miss. The drafter-versus-architect question is only about who draws the architecture. It says nothing about structure.

    In Tampa Bay, design wind speeds are high and site-specific. Building departments typically require wind-load design and signed and sealed structural or engineering documents for new homes. Requirements vary by jurisdiction, but you should plan on an engineer whichever way you go.

    So the real comparison isn’t drafter versus architect plus engineer. It’s drafter plus engineer versus architect plus engineer.

    What Each One Brings

    A drafter or designer

    Good drafters are fast, efficient and very good at turning a clear set of decisions into clean drawings. Plenty of builders lean on the same drafter for years because the relationship works. If you already know exactly what you want and the lot is simple, a drafter can be a smart fit.

    A licensed architect

    An architect is trained and licensed to carry a design from the first conversation through construction. When an architect signs and seals the documents, they become the architect of record and take professional responsibility for them. Architects sign and seal under rules of the Florida Board of Architecture and Interior Design, and digital sealing is permitted.

    The value of an architect usually shows up in the phases that aren’t drawing: programming, design development, permit comments and construction administration. We break those phases down in what an architect actually does on a new home.

    Drafter vs. Architect: Side by Side

    QuestionDrafter or designerLicensed architect
    Can legally draw a single-family home or townhouse in Florida?YesYes
    Can draw a commercial or franchise building?Generally no, except other buildings under $25,000 that aren’t public-useYes
    Signs and seals the architectural documents?NoYes, as architect of record
    Structural engineeringSeparate engineer, typically requiredSeparate engineer, typically required
    Typical scopeDrawings from decisions you’ve already madeProgramming through construction administration
    FeesVaries by scopeNational guides: about 8%–15% of construction cost for custom homes; about $100–$250 an hour
    Best fitSimple homes, repeat plans, tight and defined scopeComplex lots, custom homes, commercial and franchise work

    When Each Option Makes Sense

    A drafter often makes sense when:

    • The home is simple and the lot has no flood or setback surprises.
    • You’re reusing a plan that has already been permitted nearby.
    • Your builder is managing design decisions and just needs clean drawings.

    An architect often makes sense when:

    • The lot is waterfront, in a flood zone or tight on setbacks.
    • The home is fully custom and you want one person owning the design through construction.
    • The project is commercial or franchise work, where an architect is generally required anyway.

    Neither choice is wrong. The wrong move is picking on price alone without asking what you get for it.

    Where TomCo Fits

    TomCo’s Design Studio holds architecture license AR100677, and TomCo is also a licensed design-build general contractor. You can design and build with us, or hire us for design only and build with any contractor. We also work for other GCs: the GC keeps the client and the build, and we provide the drawings. See our architectural services for contractors.

    Design projects start around $3,500, with larger or more complex work typically running about $8,000–$40,000+. The fixed fee is quoted up front after a discovery call.

    Frequently Asked Questions

    Can a draftsman legally draw house plans in Florida?

    Yes. Fla. Stat. 481.229(1) exempts one-family and two-family homes, townhouses and their domestic outbuildings from the architect license requirement, regardless of cost.

    Do I need an architect for a commercial building in Florida?

    Generally, yes. Commercial projects such as franchise restaurants, retail and offices generally require a Florida-licensed architect, with engineers for structural, MEP and other disciplines.

    What about small non-residential buildings?

    Other types of buildings costing less than $25,000 are also exempt from the architect requirement, except schools, auditoriums and other public-use buildings.

    Does a home drawn by a drafter still need an engineer?

    Typically, yes. Building departments typically require wind-load design and signed and sealed structural documents for new homes. Requirements vary by jurisdiction.

    Can an engineer act as my architect?

    Partly. Under Fla. Stat. 481.229(4), registered engineers may perform architectural services purely incidental to their engineering practice, but they cannot call themselves architects.

    What does architect of record mean?

    The architect of record is the licensed architect who signs and seals the construction documents and takes professional responsibility for them.

    Pick the Right Pen for the Project

    If you’re weighing a drafter against an architect, start with the building type, then the lot, then how much help you want after the drawings are done. If you’d like a licensed architect backed by a team that builds what it draws, TomCo’s residential architect team in Tampa is ready to talk it through.

    Schedule a private 30-minute consultation or call (813) 922-2299.

  • What Does an Architect Actually Do on a New Home?

    What Does an Architect Actually Do on a New Home?

    What Does an Architect Actually Do on a New Home?

    Ask ten people what an architect does and most will give you the same answer: draws the house. That’s the part you see. It’s not the part that decides whether your new Tampa Bay home gets permitted on schedule, lands near budget and still works the way you pictured it ten years from now.

    An architect turns what you want into decisions a builder can price, a building department can approve and a crew can build. On a new home, that work happens in six phases, and each one asks you to decide something different. Here’s what actually goes on in each.

    Key Takeaways

    • Architectural work on a new home typically runs through six phases: programming, schematic design, design development, construction documents, permitting support and construction administration.
    • The biggest, cheapest decisions happen early. Moving a line on paper costs far less than moving a wall in the field.
    • Structural engineering, surveys and energy calculations are separate disciplines that the architect coordinates.
    • At TomCo, architectural design starts at about 6 weeks from discovery to permit-ready documents, and full custom homes typically take about 12–24 weeks or longer.

    Phase 1: Programming (Figuring Out What You Need)

    Programming is the interview. Before anyone draws a line, the architect learns how you live. How many bedrooms. Who works from home. Whether a parent might move in someday. How you entertain. Where the cars, the boat and the bikes go.

    It also covers the lot. On a Tampa Bay new build, that means setbacks, the flood zone, where the afternoon sun hits, the view you want to frame and the neighbor’s window you’d rather not stare into.

    The result is a written program: a wish list with room-by-room square footage targets and a frank budget conversation. It isn’t glamorous. It’s where a lot of bad houses could have been saved.

    Phase 2: Schematic Design (The Big Moves)

    Schematic design is where the house takes shape. Expect rough floor plans, simple massing and a few options for how the home sits on the lot. One story or two. Front-load garage or side-load. A lanai facing the water or the pool.

    This is the phase to push back. If the kitchen feels tight on paper, it will feel tighter with cabinets in it. Changing things now costs a few hours of redrawing. Changing them after framing costs real money and real time.

    Phase 3: Design Development (Locking In the Details)

    Once the layout is right, design development fills in the choices that drive cost: window sizes and types, roof shape and pitch, ceiling heights, exterior materials, the structural approach and where the mechanical equipment lives.

    This is also when outside disciplines come in. Structural engineering, MEP, energy calculations and a survey are typically separate from the architectural fee. A good architect coordinates them so the structure and the design agree before the construction documents start, not after a reviewer catches the conflict.

    Phase 4: Construction Documents (The Set That Gets Built)

    Construction documents are the full drawing set a building department reviews and a builder prices and builds from. Expect a site plan, floor plans, exterior elevations, building sections, a roof plan, door and window schedules, wall details and notes tying everything to the Florida Building Code.

    In Tampa Bay, these drawings have to answer wind and flood questions clearly. Design wind speeds here are high and site-specific. Lots in flood zones must be elevated to the design flood elevation set by FEMA maps and local freeboard rules. Building departments typically require signed and sealed structural documents alongside the architectural set.

    If you’ve never read a plan set, our homeowner’s guide to reading architectural plans walks through each sheet.

    Phase 5: Permitting Support

    Submitting plans is rarely one and done. Reviewers send comments. Someone has to answer them, revise the drawings and resubmit without breaking something else in the set.

    That’s the architect’s job in this phase. Timing matters more than usual right now, too. The Florida Building Code 9th Edition (2026) takes effect December 31, 2026. Permit applications submitted before that date are generally reviewed under the 8th Edition, and applications submitted on or after it fall under the 9th. If your new home is in design this fall, ask your architect which side of that date you’ll land on.

    Phase 6: Construction Administration

    Once building starts, questions come up that no drawing set fully answers. A beam conflicts with a duct run. A window manufacturer changes a size. You decide you want a different exterior material.

    Construction administration is the architect answering those questions, reviewing submittals and protecting the design intent while the house goes up. When the architect and the builder work under one roof, as they do in design-build, those answers move a lot faster.

    Phase by Phase: What Happens and What You Decide

    PhaseWhat happensWhat you decide
    ProgrammingInterviews, lot review, written wish list and square footage targetsHow you live, the rooms you need, your budget range
    Schematic designRough floor plans, massing and placement on the lotLayout, number of stories, garage and lanai orientation
    Design developmentWindows, roof, materials, structure and equipment locations; consultants brought inCost-driving choices, ceiling heights, exterior look
    Construction documentsFull permit and construction set with code notes and coordinated engineeringFinal sign-off on the design before pricing
    Permitting supportSubmittal, reviewer comments, revisions and resubmittalAny changes needed to clear review; permit timing
    Construction administrationField questions, submittal review, design intent protectedSubstitutions and field changes

    Does Every New Home in Florida Need an Architect?

    Not legally. Florida law exempts one- and two-family homes and townhouses from the architect license requirement, so a drafter or designer can legally draw a single-family home. Structural engineering is still typically required either way.

    The better question is whether you want someone carrying the design through all six phases or someone who produces drawings and hands them off. That choice shapes how many surprises you meet later.

    What It Costs

    National cost guides such as HomeGuide put architect fees for custom homes and new builds at about 8%–15% of construction cost. TomCo’s Design Studio works differently: a fixed design fee, quoted up front after a discovery call. Design projects start around $3,500, and larger or more complex work typically runs about $8,000–$40,000+. Outside disciplines like structural, MEP, geotechnical, survey and energy calcs are coordinated by TomCo but not included automatically.

    For a deeper breakdown, see how much an architect costs in Tampa.

    Frequently Asked Questions

    What does an architect do on a new home?

    An architect turns your needs, budget and lot into a permit-ready design. On a new home that typically means programming, schematic design, design development, construction documents, permitting support and construction administration.

    Which phase of design matters most?

    The early ones. Programming and schematic design set the size, layout and placement of the house, and changes there cost far less than changes once construction documents or framing are underway.

    Is structural engineering included in the architect’s work?

    Usually not automatically. Structural, MEP, survey and energy calculations are separate disciplines. At TomCo, the Design Studio coordinates them, and building departments typically require signed and sealed structural documents for new homes.

    How long does architectural design take for a new home?

    At TomCo, architectural design starts at about 6 weeks from discovery to permit-ready architectural documents. Full custom homes typically take about 12 to 24 weeks or longer, depending on complexity and review comments.

    Can I hire TomCo for design only and build with another contractor?

    Yes. You can design and build with TomCo, or hire the Design Studio for design only and build with any contractor you choose.

    Does the 2026 Florida Building Code change affect my new home?

    It may. The 9th Edition takes effect December 31, 2026. Applications submitted before that date are generally reviewed under the 8th Edition, so plan your permit timing with your architect.

    Bring In the Architect Before You Fall for a Floor Plan

    The best time to bring in an architect is before you’ve committed to a layout. TomCo’s in-house Design Studio (architecture license AR100677) handles every phase of a new home, from the first conversation to the last field question. And because TomCo is a licensed design-build general contractor, the people drawing your house know how it gets built. Learn more about our residential architect services in Tampa.

    Schedule a private 30-minute consultation or call (813) 922-2299.

  • What Is Value Engineering? Cutting Cost Without Cutting Quality

    What Is Value Engineering? Cutting Cost Without Cutting Quality

    Every construction budget has a moment where the numbers come back higher than hoped. What happens next separates a good outcome from a disappointing one. The reflexive move is to strip things out. The disciplined move is value engineering: examining each part of the design to find ways to deliver the same function, durability, and experience for less.

    Done well, value engineering makes a project better. Done badly, it’s just cheapening with a nicer name. Here’s how to tell the difference.

    Key Takeaways

    • Value engineering asks “what is this element for, and is there a smarter way to achieve it?” rather than “what can we delete?”
    • The biggest savings usually hide in structure, layout efficiency, and systems, not in finishes.
    • The best time to value-engineer is during design, when changes are free. The worst time is mid-construction.

    Where the Term Comes From

    Value engineering originated in manufacturing during World War II, when material shortages forced engineers to find substitutes that performed as well as the originals. The core idea carried into construction: analyze every component by the function it serves, then look for alternatives that deliver that function at lower total cost.

    The key word is function. A roof’s function is to keep water out and resist wind for fifty years. If two roofing systems both do that, the cheaper one is the better value. If the cheaper one fails in fifteen years, it isn’t.

    What It Looks Like on a Custom Home

    Working through a design with a value-engineering lens, a design-build team might find:

    Structure. Aligning bearing walls floor to floor so beams get shorter. Adjusting a span by a foot to move from steel to engineered lumber. Simplifying a roof with too many intersecting planes. These changes are often invisible in the finished home and save real money.

    Layout. Trimming hallway length. Stacking plumbing so bathrooms share walls. Reducing exterior corners, each of which adds foundation, framing, and finishing cost.

    Envelope. Standardizing window sizes so more units come from stock rather than custom. Choosing one high-performance window line rather than three.

    Systems. Right-sizing HVAC instead of oversizing “to be safe.” Grouping mechanical equipment to shorten runs. Planning the electrical panel around actual loads.

    Finishes. Using premium materials where hands and eyes land (kitchen island, primary bath, entry) and quality standard materials elsewhere. Large-format porcelain instead of natural stone in secondary baths.

    None of these lowers the quality of the home. Most improve it, because simpler structures and shorter systems have fewer failure points.

    What It Looks Like on Multifamily and Commercial

    On apartment and mixed-use projects, value engineering scales. A single repeated unit plan multiplied by a hundred means a small efficiency per unit becomes a large number. Common targets include structural system selection (wood versus concrete versus steel at different building heights), unit plan efficiency, corridor and core layout, and the balance between building envelope performance and mechanical load. Our multifamily value engineering practice focuses on exactly these levers for developers and investors.

    What Value Engineering Is Not

    Value Engineering Cheapening
    Same function, lower total cost Lower function, lower first cost
    Considers lifetime durability and maintenance Considers only the bid number
    Preserves the design intent Erodes it one substitution at a time
    Done in design with the whole team Done under pressure at the end
    Documented, with trade-offs stated Undocumented “we changed this”

    If a proposed change would make the home less durable, less comfortable, or less like the design you approved, it isn’t value engineering. Say so.

    When to Do It

    Changes cost almost nothing on paper and a great deal in the field. The right sequence:

    1. Schematic design. Set the budget and let it shape the plan’s size and complexity from the start.
    2. Design development. The main value-engineering pass, when structure, systems, and materials are being chosen.
    3. Pre-construction. A final review against real pricing before the permit set is finished.
    4. Construction. Only for unforeseen conditions. Late changes carry rework, delay, and coordination risk.

    This is one reason the design-build model fits value engineering so well. The people pricing the work sit in the same meetings as the people drawing it, so cost feedback arrives while it can still influence the design.

    How to Participate as the Owner

    You don’t need to know framing to contribute. Tell your team:

    • Which spaces matter most to you and which you’d never notice
    • Where you want to touch premium materials and where standard is fine
    • Whether you value lower first cost or lower operating cost over time
    • What you’re unwilling to compromise on

    Then ask for each proposed change to be presented as a trade-off: what it saves, what it changes, and what it doesn’t. A good team welcomes the question.

    Frequently Asked Questions

    Does value engineering mean the design gets worse?

    It shouldn’t. Properly done, it removes cost that wasn’t adding value. If a change reduces durability or changes the design intent, it’s a scope cut, not value engineering.

    How much can it save?

    It depends on where the design started. Projects designed without cost feedback often have meaningful savings available in structure and systems. Projects designed with a builder at the table from the start have less to find, which is the point.

    Who leads the process?

    On a design-build project, the builder’s estimator, the designer, and the engineer work together. On a traditional project, it often falls to the general contractor after bids come in, which is late.

    Can I value-engineer a renovation?

    Yes. Common opportunities include keeping plumbing in place, working within the existing structure, and prioritizing spend on the rooms you use daily.

    Is a cheaper material ever the right call?

    Often. The question is whether it performs the function for the life you expect. A well-made porcelain tile that looks like stone is frequently the better value in a secondary bath.

    Does TomCo value-engineer every project?

    Cost feedback is built into our design process, so most of it happens before anyone calls it value engineering. We also perform formal reviews for developers on multifamily and commercial projects.

    Spend Where It Counts

    The goal is a home or a building that delivers everything you wanted, with nothing you paid for that you didn’t need. TomCo Solutions brings construction pricing into the design room from day one across Tampa Bay.

    Schedule a private 30-minute consultation or call (813) 922-2299.

  • How to Read Architectural Plans: A Homeowner’s Guide

    How to Read Architectural Plans: A Homeowner’s Guide

    The plan set for your new home or renovation may run thirty pages or more. Most of it looks like a foreign language: lines, symbols, abbreviations, and numbers in tiny type. Yet those pages are the contract between what you imagined and what gets built. If you can read them, you can catch problems while they’re still erasable.

    This guide walks through what’s in a typical residential plan set and what to look for on each sheet.

    Key Takeaways

    • A plan set has a predictable order: site, floor plans, elevations, sections, details, then structural and MEP sheets.
    • Scale, symbols, and dimension strings are the three skills that unlock everything else.
    • Review plans room by room, walking through your daily routine, not just admiring the overall picture.

    How a Plan Set Is Organized

    Sheets are numbered by discipline. The exact system varies by firm, but a residential set generally follows this order:

    Prefix Sheets What They Show
    G or T General / Title Project info, sheet index, code summary, abbreviations
    C Civil / Site Property lines, setbacks, grading, drainage, utilities, tree survey
    A Architectural Floor plans, roof plan, elevations, sections, details, schedules
    S Structural Foundation, framing, connections, wind design
    M / E / P Mechanical, Electrical, Plumbing HVAC layout, lighting and outlets, fixture and drain locations

    Start with the title sheet. It tells you what code edition the design follows, the wind speed and exposure the engineer designed for, and the flood zone. Those three facts shape everything downstream.

    The Site Plan

    The site plan shows your lot from above with the house placed on it. Check:

    • Setbacks. The dashed lines showing how close the house may sit to each property line. The building must fall inside them.
    • Elevations. Spot elevations and the finished floor elevation, especially in a flood zone.
    • Drainage arrows. Which way water flows after grading.
    • Trees. Existing trees to remain, to be removed, and their protection zones. In Tampa, trees above certain trunk sizes require permits, and grand trees have special protection.
    • Driveway, walks, pool, and equipment pads. All count toward impervious coverage limits.

    Floor Plans

    The floor plan is a horizontal cut through the house about four feet above the floor, viewed from above. It’s the sheet homeowners spend the most time with, and rightly so.

    Scale. Residential plans are commonly drawn at 1/4 inch = 1 foot. A dimension you can’t find can be measured with an architect’s scale, but printed dimensions always govern.

    Dimension strings. The layered lines with numbers along each wall. Outer strings give overall dimensions; inner strings locate individual walls, windows, and doors. Dimensions typically run to the face of framing or the face of block, not to finished drywall, so rooms measure a little smaller when built.

    Walls. Thick, filled walls are usually exterior or structural. Thinner walls are interior partitions. Look for wall types keyed to a legend.

    Doors and windows. Each is tagged with a number or letter that refers to a schedule listing size, type, glass, and rating. Door swings are drawn as arcs. Check that doors don’t collide and that swings make sense for how you’ll move through the space.

    Symbols. Small circles, triangles, and hexagons reference details, sections, and elevations on other sheets. A triangle with a number inside means “go look at that detail.”

    Walk your day through the plan: from bed to bathroom to kitchen to garage. Where do groceries land? Where does wet laundry go? Where do the dogs eat? Plans that look beautiful in overview often reveal awkward moments at this level.

    Elevations

    Elevations are straight-on views of each exterior face, labeled by compass direction or by front, rear, left, and right. They show:

    • Roof pitch (expressed as rise over 12, such as 6:12)
    • Window and door placement and proportion
    • Exterior materials and where they change
    • Finished floor, ceiling, and ridge heights
    • Ground line and how the home meets grade

    Elevations are where you confirm that the house you see in your head is the house on paper. Ask for a 3D rendering if you struggle to read them; most firms produce one.

    Sections and Details

    A section slices vertically through the house to show how floors, walls, and roof relate. It reveals ceiling heights, attic space, stair headroom, and how the second floor stacks on the first.

    Details zoom in on specific conditions: how the roof meets the wall, how a window is flashed, how tile meets a shower curb. They’re small drawings with large consequences for waterproofing and durability.

    Schedules

    Schedules are tables that list repetitive elements:

    • Door and window schedules. Size, material, glazing, impact rating, hardware.
    • Finish schedule. Floor, wall, ceiling, and base material for every room.
    • Fixture and appliance schedules. Model numbers, sizes, and locations.

    Cross-check schedules against the allowances in your contract. This is where “we assumed” becomes “you agreed to.”

    Structural and MEP Sheets

    You don’t need to check the engineer’s math, but you should look at:

    • Foundation plan. Where footings and stem walls sit, and the finished floor elevation.
    • Framing plans. Beam locations that might create a soffit or dropped ceiling in a room you imagined as open.
    • Electrical plan. Outlet and switch locations, ceiling fans, and where the panel sits. This is the easiest sheet to fix and the most common source of regret.
    • Plumbing plan. Fixture locations and where the water heater lives.
    • HVAC plan. Where equipment, ducts, and returns run. Returns in bedrooms and a well-placed thermostat matter for comfort.

    A Review Checklist

    Before you sign off on a plan set:

    1. Confirm the finished floor elevation against your flood zone requirement
    2. Walk every room in your daily routine
    3. Open every door in your mind and check the swing
    4. Count outlets in the kitchen, primary bath, and home office
    5. Find every beam or duct that might lower a ceiling
    6. Match window and door schedules to what you expect to see
    7. Check the finish schedule against your selections and allowances
    8. Ask what “typical” and “similar” mean anywhere they appear

    Frequently Asked Questions

    What scale are house plans drawn at?

    Most floor plans and elevations use 1/4 inch = 1 foot. Site plans use a smaller scale, and details a larger one. The scale is printed on each drawing.

    Why do the rooms feel smaller than the dimensions on the plan?

    Dimensions usually run to framing, not to finished surfaces. Drywall, tile, and trim take up a few inches in each direction.

    What does “VIF” mean on a drawing?

    Verify in field. The designer is telling the builder to measure the actual condition before building, common in renovations.

    Can I request changes after the plans are done?

    Yes, but the later the change, the more it costs. Changes during design are nearly free. Changes after permitting require revisions and re-review. Changes during construction may require tearing out work.

    Do I need to understand the structural sheets?

    Not in detail. Look for beams and columns that affect the spaces you care about, and confirm the wind design criteria on the title sheet match your expectations.

    Will TomCo walk me through my plans?

    Yes. Plan review with the homeowner is part of every design engagement at our architectural design studio.

    Read Before You Build

    The best time to find a problem is when it’s still a pencil line. TomCo Solutions designs and builds homes across Tampa Bay and reviews every plan set with clients, page by page, before construction begins.

    Schedule a private 30-minute consultation or call (813) 922-2299.

  • Architect vs. Engineer: Who Do You Actually Need for Your Tampa Project?

    Architect vs. Engineer: Who Do You Actually Need for Your Tampa Project?

    Homeowners planning a custom home, an addition, or a major renovation hear both words constantly: architect and engineer. They’re often used interchangeably, and they shouldn’t be. Architects shape how a building looks, flows, and lives. Engineers make sure it stands up, stays dry, and survives a hurricane.

    Understanding the difference helps you hire the right people, avoid paying for services you don’t need, and recognize when a project needs both.

    Key Takeaways

    • Architects design space, form, and function; engineers design the systems that make the building safe.
    • Florida law does not require an architect for a one- or two-family home, but structural engineering is almost always required for new construction and structural changes.
    • Design-build firms coordinate both roles under one contract, which reduces gaps and finger-pointing.

    What an Architect Does

    An architect translates how you want to live into a buildable design. That includes:

    • Site planning. Orientation for sun and breeze, views, privacy, and how the home meets the lot.
    • Floor plans and flow. Room relationships, circulation, ceiling heights, sightlines.
    • Exterior design. Massing, roof forms, materials, proportion, and how the home relates to its neighborhood.
    • Code compliance. Egress, accessibility, fire separation, energy code.
    • Coordination. Making the structural, mechanical, electrical, and plumbing pieces fit inside the design without compromising it.

    Architects in Florida are licensed by the Department of Business and Professional Regulation under Chapter 481 of the Florida Statutes. Licensure requires an accredited degree, years of documented experience, and passing the national registration exams.

    What an Engineer Does

    Engineers apply physics and code to specific systems. On a residential project you may encounter several:

    Engineer What They Handle
    Structural Foundations, beams, load paths, wind and uplift resistance, connections
    Civil Site grading, drainage, stormwater, utility connections
    Geotechnical Soil borings and bearing capacity, especially on questionable or waterfront soils
    Mechanical / Electrical / Plumbing (MEP) HVAC sizing, electrical service, plumbing design on larger or complex homes

    Structural engineers are the ones most homeowners meet. In Tampa Bay, their work is dominated by wind: roof-to-wall connections, shear walls, impact-rated openings, and the continuous load path that carries hurricane forces from the roof down into the foundation.

    Engineers are licensed separately under Chapter 471 of the Florida Statutes and sign and seal drawings within their discipline.

    What Florida Law Requires for a House

    Here is where many homeowners are surprised. Under Florida Statute 481.229, no one is required to be a licensed architect to prepare plans for a one-family or two-family residence, regardless of cost. That exemption is why residential designers and design-build firms can legally produce house plans without an architect’s seal.

    Structural engineering is a different matter. Building departments across Tampa Bay generally require signed and sealed structural drawings for new homes, additions, and any work that alters load-bearing elements. The Florida Building Code’s wind provisions make this nearly unavoidable in our region. Truss drawings, foundation designs, and wind-load calculations all typically carry an engineer’s seal.

    Commercial buildings, multifamily projects, and anything intended for public use follow much stricter rules, and an architect’s involvement is usually mandatory.

    When You Need an Architect

    You’ll benefit from a licensed architect when:

    • The home is complex, large, or on a difficult site
    • You want a distinctive design rather than a modified stock plan
    • The project is in a historic district with design review
    • You’re building commercial, mixed-use, or multifamily
    • You want a single professional responsible for the whole design vision

    For a simple addition or a kitchen remodel that doesn’t touch structure, an experienced residential designer working with an engineer can be entirely appropriate.

    When You Need an Engineer

    You’ll almost certainly need a structural engineer when:

    • Building any new structure, including an ADU
    • Removing or modifying a load-bearing wall
    • Adding a second story or a large addition
    • Building in a flood zone or on a waterfront lot
    • Repairing storm damage that affected the roof structure or framing

    A civil engineer enters the picture when drainage, grading, or stormwater rules apply, which is common on larger lots and anywhere a new impervious surface changes how water leaves the property.

    Why Design-Build Simplifies This

    In a traditional arrangement, you hire an architect, the architect hires or recommends engineers, and then you separately bid the construction. If the drawings are hard to build or over budget, the parties often point at each other.

    In design-build, one firm carries responsibility for design and construction. The architect or designer, the engineers, and the builder work as one team from the first sketch. Structural decisions get made with cost in mind. Changes get priced in real time. When something needs to be solved, one phone number answers.

    TomCo Solutions operates this way through its architectural design studio, coordinating licensed architects and engineers alongside our construction team.

    Frequently Asked Questions

    Do I legally need an architect to build a custom home in Florida?

    No. Florida Statute 481.229 exempts one- and two-family residences from the architect requirement. Many homeowners still choose one for design quality, but it isn’t mandated.

    Do I need an engineer for a kitchen remodel?

    Only if the remodel changes structure, such as removing a wall, enlarging a window opening, or adding weight the existing framing wasn’t designed for. Cosmetic remodels generally don’t require one.

    Who signs the plans that go to the building department?

    Whoever is licensed for the work shown. Structural sheets carry the engineer’s seal. Architectural sheets carry the architect’s seal when an architect is involved. Some jurisdictions accept unsealed architectural sheets for a single-family home, but sealed structural sheets are the norm.

    Can one person be both?

    Rarely. A few professionals hold both licenses, but they’re uncommon. In practice you’ll work with a team.

    What does architectural design cost?

    It varies with scope. TomCo design engagements start around $3,500, with complete plan sets for custom homes typically falling in the $8,000 to $40,000-plus range depending on complexity. Engineering is usually priced separately.

    What’s the difference between an architect and a draftsperson?

    A draftsperson produces drawings, often from someone else’s design direction. An architect is licensed to design buildings and takes professional responsibility for the design. Both have a place; the question is who is making the decisions.

    Get the Right Team From the Start

    Whether your project needs an architect, an engineer, or both, the biggest mistake is figuring it out after plans are drawn. TomCo Solutions assembles the right design and engineering team for your project and manages it through construction.

    Schedule a private 30-minute consultation or call (813) 922-2299.